The energy centre in Gossau

In the newly built energy centre in Gossau, a vertical spruce facade treated with UVood® could be installed. After about 11 months of weathering in the form of wind, rain and sun, an extremely positive result is evident:

In comparison to an untreated facade, which was installed on the same building, the facade treated with UVood® shows no greying and hardly any visible colour change.

Uvood® treated facade in comparison to a 
pregreyed spruce façade 
(comparable to a natural greying).

Left: Untreated spruce façade 11 months after installation.


Right: Uvood® treated spruce facade after the same amount of time.